Τίτλος
-
Load analysis and load flow analysis on the Kato Paphos area network. Investigation of the system conditions and optimization
-
Θέμα
-
Electric power distribution--Cyprus
-
Δημιουργός
-
Parouti, Maria
-
Πηγή
-
Higher Technical Institute
-
Το πλήρες κείμενο είναι διαθέσιμο από το Υπουργείο Ενέργειας, Εμπορίου Βιομηχανίας και Τουρισμού.
-
Εκδότης
-
Library of Cyprus University of Technology
-
Ημερομηνία
-
1999
-
Συνεισφέρων
-
Demetriou, John
-
Δικαιώματα
-
Απαγορεύεται η δημοσίευση ή αναπαραγωγή, ηλεκτρονική ή άλλη χωρίς τη γραπτή συγκατάθεση του δημιουργού και κάτοχου των πνευματικών δικαιωμάτων.
-
Μορφή
-
pdf
-
Γλώσσα
-
en
-
Τύπος
-
text
-
Αναγνωριστικό
-
EED0622
-
Σύνοψη
-
The objective of this project is the reinforcement of the power network which is use for the electricity supply Kato Paphos area. In order to do that, we will study the main factors on which the existing power network works on, its limitations and the problems arising when it is in full needs or overloaded. The system needs to be examined when in operational conditions.
At first we will take the historical observations in the behaviour of the system in the area. Then, we will observe what will happen, at ten years time, when there is an overload, with regression analysis and we will estimate what would be the behaviour in the future. Consequently we will examine the system under several loading conditions in order to determine the point in time at which the system shall be unable to preserve stability and sustainable economical losses are attained.
Having done that, we will derive the point in time when reinforcement of the system is necessary for more effective use by establishing a new transmission substation in the area. Then we will look at the reinforced system and examine alternative medium voltage reinforcements that would make the new transmission substation as operative as possible. For presentation purposes in describing the excising and future system conditions detailed statistics graphs, as well as single line diagrams and topographic maps are used. Furthermore, throughout the project the POWER SYSTEM ANALYSIS (PSA PC APPLICATION) program is used in order to perform the above assignment without a lot of time waste.